
Add to Cart
Customized Grey Iron HT200 Iron Casting Parts For Construction Machinery
Quick Detail:
· Grey Iron Casting Base
· Grey iron HT200
· Sand Casting
· Shot Blasting surface
· Construction Machinery
Product Description:
The cast iron base is the base part of a certain part, and its material is gray iron or ductile iron. Its main production process is to make molds according to the drawings, then use sand for modeling, and then pour molten iron into the model, knock off the sand after cooling, and then get the base blank through shot blasting.
Product Specifications:
Commodity | Iron Casting & Machining Parts / Gear Cap |
Standard | ASTM, DIN, JIS, EN, ISO, BS, JCSI, GB |
Material | Grey iron (HT200,HT250,HT300), Ductile iron (QT400-18,QT400-15,QT450-10,QT500-7) |
Unit Weight | 0,05 kg ~ 1,000 kg. |
Tolerance | CT6-CT8 |
Machining | Turning, Milling, Drilling, Cutting, Reaming, Threading, Welding, Tooling, etc |
Surface Treatment | Shot blasting, Painting, Powder coating, Electroplating, Chrome plating, etc |
Package | Standard wooden box package or as your customized package |
Applications | Agricultural machinery, Petroleum machinery, Mining machines, Construction, Automotive & Truck, Medical, Marine, Railway & Train, Power lines, Furniture, Lighting, Flange, Valve and Pump, Electronic, Pipeline, etc. |
Brand | Twinkle Industrial |
Product Applications:
Widely used agricultural machinery, petroleum machinery, mining machines, construction, automotive & truck, medical, marine, railway & train, power lines, furniture, lighting, flange, valve and pump, electronic, pipeline, etc.
FAQ
Q1. How can we get a quotation?
A: Please send the parts 2D drawing (in PDF format) and 3D model in IGS or STP format together with material, production technique, purchasing qty, etc, or provide sample to us.
Q2. What about the lead time?
A: 15-20 days for Sample making ,20 working days for mass production.
Q3. Do you have any MOQ limit for casting parts?
A: It depends on different parts. For some parts, 1 pc can be acceptable.
Q4. What is your payment term?
A: Mold: 50% payment in advance, balance after the sample approval.
B: Mass production: 30% payment in advance, 70% balance before shipment.
Q5. What is your quality control process?
A: Each casting parts will be provided with raw material report ( chemical composition and physical property), and dimension measuring report before shipment.
Q6. How about the packaging?
A: Standard wooden box package or as your customized package.