
Add to Cart
Carbon Steel Hot Cold Forging Parts Forged Steel Parts For Truck Tractor Trailer
Quick Detail:
· Carbon Steel Forging Parts
· Carbon Steel 45#
· Hot/Cold/Die/Drop Forging + Precision Machining
· Shot Blasting
· Car/Truck/Tractor/Fork lift/Trailer
Product Description:
Forging is a metal shaping technique using compressive, localized forces, has been a staple metal fabrication technique since the time of the ancient Mesopotamian. There are two main types of forging, hot forging and cold forging. It mainly depends on the different application and physical property.
Generally the forged products includes forged ring, shaft, bush, shape, disk, etc.
Product Specifications:
Commodity | Steel Forging & Machining Parts |
Standard | ASTM, DIN,JIS, EN, ISO, BS, GB |
Material | Carbon Steel 45#, Alloy Steel, Stainless Steel 304, 316 |
Unit Weight | 0.1kg ~ 1000kg. |
Tolerance | CT6 ~ CT8 |
Machining | Turning, Milling, Drilling, Cutting, Reaming, Threading, Welding, Tooling, etc |
Surface Treatment | Shot blasting, Painting, Powder coating, Electroplating, Chrome plating, Nickel plating, Mirror polishing, etc. |
Package | Standard wooden box package or as your customized package |
Applications | Agricultural machinery, Petroleum machinery, Mining machines, Construction, Automotive & Truck, Medical, Marine, Railway & Train, Power lines, Furniture, Lighting, Valve and Pump, etc. |
Brand | Twinkle Industrial |
Product Applications:
Widely used agricultural machinery, petroleum machinery, mining machines, construction, automotive & truck, medical, marine, railway & train, power lines, furniture, lighting, valve and pump, etc.
FAQ
Q1. How can we get a quotation?
A: Please send the parts 2D drawing (in PDF format) and 3D model in IGS or STP format together with material, production technique, purchasing qty, etc, or provide sample to us.
Q2. What about the lead time?
A: 15-20 days for Sample making ,20 working days for mass production.
Q3. Do you have any MOQ limit for forging parts?
A: It depends on different parts. For some parts, 1 pc can be acceptable.
Q4. What is your payment term?
A: Mold: 50% payment in advance, balance after the sample approval.
B: Mass production: 30% payment in advance, 70% balance before shipment.
Q5. What is your quality control process?
A: Each casting parts will be provided with raw material report ( chemical composition and physical property), and dimension measuring report before shipment.
Q6. How about the packaging?
A: Standard wooden box package or as your customized package.