
Add to Cart
OEM Iron Casting Housing Metal Casting Parts For Machine Components
Quick Detail:
· Metal Gravity Casting Parts
· Aluminum alloy
· Gravity Casting Production Technique
· Shot Blasting
· Automotive/Machinery
Product Description
Grey iron casting parts can be finished with a variety of surface treatments, including painting, powder coating, and plating, to improve their appearance and protect them from corrosion. They can also be heat-treated to improve their strength and hardness, making them suitable for use in applications where the part is subjected to high stress or wear.
Product Specifications:
Commodity | Metal Sand Casting Parts |
Standard | ASTM, DIN,JIS, EN, ISO, BS, JCSI, GB |
Material | 1) ADC10, ADC12, A360, A380, A413, A356, LM20, LM24 3) Grey iron, HT200, HT250, Ductile iron, QT400, QT450, QT550 |
Mold Material | SKD61, H13 |
Tolerance | CT4-CT8 |
Machining | Turning, Milling, Drilling, Cutting, Reaming, Threading, Welding, Tooling, etc |
Surface Treatment | Shot blasting, Painting, Polishing, Powder coating, Electroplating, Chrome plating, etc |
Package | Standard wooden box package or as your customized package |
Applications | Agricultural machinery, Petroleum machinery, Mining machines, Construction, Automotive & Truck, Medical, Marine, Railway & Train, Power lines, Furniture, Lighting, Flange, Valve and Pump, Electronic, Pipeline, etc. |
Brand | Twinkle Industrial |
Product Applications:
Widely used agricultural machinery, petroleum machinery, mining machines, construction, automotive & truck, medical, marine, railway & train, power lines, furniture, lighting, flange, valve and pump, electronic, pipeline, etc.
FAQ
Q1. How can we get a quotation?
A: Please send the parts 2D drawing (in PDF format) and 3D model in IGS or STP format together with material, production technique, purchasing qty, etc, or provide sample to us.
Q2. What about the lead time?
A: 15-20 days for Sample making ,20 working days for mass production.
Q3. Do you have any MOQ limit for casting parts?
A: It depends on different parts. For some parts, 1 pc can be acceptable.
Q4. What is your payment term?
A: Mold: 50% payment in advance, balance after the sample approval.
B: Mass production: 30% payment in advance, 70% balance before shipment.
Q5. What is your quality control process?
A: Each casting parts will be provided with raw material report ( chemical composition and physical property), and dimension measuring report before shipment.
Q6. How about the packaging?
A: Standard wooden box package or as your customized package.